Toronto & the GTA

Flooring Installation Toronto

Century-home subfloors are rarely flat and Toronto humidity swings hard between February and July. We level, acclimatize and install with the right expansion allowance, so your floor doesn't cup, gap or squeak two seasons later.

New hardwood flooring installation in a Toronto home living space

What's included

  • Subfloor levelling, repair and moisture testing
  • Solid hardwood, engineered, luxury vinyl plank and laminate
  • Porcelain and natural stone tile with heated floor options
  • Stair treads, risers, railings and transitions
  • Sanding, staining and refinishing of existing hardwood
  • Old flooring removal and disposal

Project timeline

  1. Day 1

    Removal of existing flooring and subfloor assessment.

  2. Days 2–3

    Levelling, repairs and material acclimatization.

  3. Days 4–6

    Installation and transitions.

  4. Days 7–8

    Finishing, trim, cleanup and inspection.

Recent flooring installation completed across Toronto and the GTA.

Flooring Installation project in Toronto — before photo
Before
Flooring Installation project in Toronto — after photo
After

Flooring Installation FAQs